Pinnacle Peak public record

Comments due Nov. 30, 5 p.m.

The issues

Water and sewer: the applicant’s filings, the state water records and the city’s reviews

The applicant’s documents say “a full 1.0 CFS” or “1.5 CFS” of water rights would go to the city, and the annexation narrative says the developer will “construct new wells sufficient not only to serve the annexed land, but to provide additional capacity for the City of Tetonia beyond the project boundary” (annexation narrative, p. 10; TischlerBise, p. 7). State records show PFG Idaho’s three Section 29 rights total 1.00 cfs, all recorded for irrigation, with 0.70 cfs leased to the state Water Supply Bank through Dec. 31, 2028 (IDWR split table, p. 2; IDWR report 22-14670, pp. 1-2). For sewer, the city engineer, citing the city’s wastewater study, puts the need for a third aerator at 88 equivalent residential units above the study’s 201, a limit that applies to the entire city system; the first phase has 150 lots (engineer’s review, Nov. 12, 2026, p. 2). In its Nov. 19 filing, the applicant’s engineer lists “Available ERUs Before Required Upgrades: 0” for the city’s water system and 88 for sewer, and the applicant wrote that “no connections can be made until additional water rights are received and a well is installed” (Eagle Rock water report, Nov. 18, 2026, p. 3; sewer report, p. 3; response worksheet, p. 8).

Key facts

The filings say 1.0 or 1.5 cfs would go to the city. PFG Idaho holds 1.00 cfs in Section 29.

All three of PFG Idaho’s rights are recorded for irrigation; 0.70 cfs is leased to the state Water Supply Bank through Dec. 31, 2028, and none of the records identifies by number which rights would go to the city.

Water rights stated for the city, and the rights PFG Idaho holds in Section 29, in cubic feet per secondThe annexation narrative states a full 1.0 cfs to be conveyed; the TischlerBise report states 1.5 cfs. IDWR records show PFG Idaho holding 1.00 cfs in Section 29: 0.30 cfs in 22-14668 and 22-14669, not leased, and 0.70 cfs in 22-14670, leased to the Water Supply Bank through Dec. 31, 2028.00.51.01.5 cfsWhat the applicant’s documents sayAnnexation narrative, received Oct. 9, 20261.0Stated: “a full 1.0 CFS” to be conveyed to the cityTischlerBise report, Dec. 23, 20251.5Stated: “1.5 CFS” of water rights to be dedicatedWhat IDWR records showHeld by PFG Idaho in Section 291.0022-14668 and 22-14669: 0.30 cfs combined, not leased22-14670: 0.70 cfs, leased to the Water Supply Bank through Dec. 31, 20280.30not leased0.70 leased to the stateWater Supply Bank through Dec. 31, 2028

Sources: annexation narrative, p. 10; TischlerBise, p. 7; split table, p. 2; IDWR letter, July 9, 2025, p. 25. PFG Idaho's 1.00 cfs is 0.30 + 0.70, read with the 0.30 cfs combined limit on 22-14668 and 22-14669. The two stated figures are the documents' words; the documents do not name the rights.

Show the figures as a table
ItemCfsSource
Annexation narrative: "a full 1.0 CFS" to be conveyed to the city1.0p. 10
TischlerBise report: "1.5 CFS" of water rights to be dedicated1.5p. 7
PFG Idaho, 22-14668 and 22-14669, combined limit; not leased0.30IDWR report 22-14668
PFG Idaho, 22-14670; Water Supply Bank lease through Dec. 31, 20280.70IDWR report 22-14670, p. 1; IDWR letter, p. 25
PFG Idaho, total in Section 291.00split table, p. 2

What this means for the decision

  • PFG Idaho’s three water rights on the land are recorded for irrigation in seasons that end Oct. 15 or Oct. 31. Serving city homes with them would take a transfer approved by the Idaho Department of Water Resources under Idaho Code 42-222 (IDWR report 22-14670, p. 1; IDWR report 22-14668, p. 1; Idaho Code 42-222).
  • None of the records on this page identifies by number which water rights would go to the city (Water promised and water held).
  • City staff wrote that “the City does not have the water capacity to service this subdivision without mitigation” (staff report, Oct. 28, 2026, p. 6). Ordinance 2026-09, adopted Sept. 30, 2026, requires water mitigation approved by the City Council to be completed before a final plat is recorded, or by a later date the council approves in a development agreement (Ordinance No. 2026-09, as provided by the City of Tetonia clerk, Nov. 19, 2026, p. 4; council minutes, Sept. 30, 2026, p. 1).
  • The city engineer’s review states: “Preliminary plat approval does not reserve capacity for all 150 units” (engineer’s review, p. 5).
  • The applicant’s Nov. 19 filing says “All phases require this new storage tank” and that “no connections can be made until additional water rights are received and a well is installed.” It has not filed the Water Rights Mitigation Plan the city engineer asked for; it says the plan “will be provided upon receipt of the City’s adopted ordinance” (response worksheet, pp. 7-8; City review and answers).

Have your say about this

Written comments to the Planning and Zoning Commission are due by 5 p.m. Monday, Nov. 30, 2026, and the commission takes spoken and written comments at its hearing at 7 p.m. Monday, Dec. 7 (hearing notice).

The comment helper opens with the “Water rights” and “Sewer” topics checked. Each adds a line from the record with its source, which you can keep or delete; what you say is up to you.

Write a comment about water and sewer Read the comment guide

Water and sewer on the Pinnacle Peak land

Each section of the record opens on its own.

In brief

IDWR records list three ground water irrigation rights in Section 29 held by PFG Idaho, LLC, owner of the land under the plat application; read with their combined limit, they total 1.00 cfs (split table, p. 2; IDWR report 22-14668). All six Section 29 rights on this page are recorded for irrigation, in seasons that end Oct. 15 or Oct. 31, and PFG Idaho's 22-14670, 0.70 cfs, is leased to the state Water Supply Bank through Dec. 31, 2028 (IDWR report 22-14670, pp. 1-2; IDWR letter, July 9, 2025, p. 25). The applicant's annexation narrative says, "Pinnacle Peak will convey a full 1.0 CFS of water rights to the City of Tetonia," and an impact report prepared for Powell Family Group says, "Pinnacle Peaks will also dedicate 136.5 acres of water rights totaling 1.5 CFS" (annexation narrative, p. 10; TischlerBise, Dec. 23, 2025, p. 7). None of the records on this page identifies by number which water rights would go to the city.

The rights on the land and PFG Idaho's other rights

Idaho Department of Water Resources records list six ground water irrigation rights with places of use in Section 29, Township 6 North, Range 45 East. The draft annexation agreement locates the project in Section 29 (draft annexation agreement, recitals). Three of the six are held by PFG Idaho, LLC, owner of the land under the preliminary plat application (plat application, p. 1), and three by Teton Valley Water, LLC. These are PFG Idaho's rights on the Pinnacle Peak land.

IDWR's records also list PFG Idaho, LLC, as the current owner of five other decreed, active rights whose places of use are in Section 6 of the same township, about three miles north of Section 29, apart from 0.6 acre in Section 36 of Township 7 North, Range 44 East: three Badger Creek irrigation rights, 22-224, 22-167 and 22-59 (priorities 1898, 1899 and 1916; 1.97, 2.11 and 2.10 cfs, limited together to 192 acres a season), and two ground water stockwater rights, 22-12139 and 22-12140 (0.07 cfs each) (IDWR water right reports, checked Nov. 19, 2026). PFG Idaho acquired them with land in Section 6 on July 29, 2025, and IDWR recorded the change in ownership on Jan. 8, 2026 (IDWR change-of-ownership filing for the five rights, received Jan. 7, 2026, pp. 1 and 8, checked Nov. 19, 2026). A real estate listing on Zillow for 317.37 acres at W 10000th, Felt, parcel RP06N45E062401, shows the property listed for sale on Oct. 29, 2026, at $3,375,000, with the listing brokerage given as Wild Rose Realty; its description says, "Stock water rights and seasonal water rights out of Badger Creek" (Zillow listing, zpid 466318183, as captured Nov. 19, 2026; an archive copy could not be saved). Teton County's parcel layer lists PFG Idaho LLC as the owner of that parcel, in Section 6 (Teton County parcel layer, checked Nov. 19, 2026). The listing does not identify any water right by number. None of the records on this page connects those five rights to the annexation, the city or the development.

The six rights

Figures are from IDWR's water right reports as checked Nov. 18 and 19, 2026. All six are decreed, active rights for irrigation from ground water. "AF" is acre-feet a year.

RightHolder of recordPriority dateSeasonRateVolumePlace of useWater Supply Bank
22-2128Teton Valley Water, LLCSept. 4, 1948April 15 to Oct. 312.78 cfs622.8 AF239.2 acres, shared with 22-10835None listed
22-10835Teton Valley Water, LLCJune 1, 1961April 15 to Oct. 310.96 cfs214.8 AFSame 239.2 acresNone listed
22-2281Teton Valley Water, LLCDec. 2, 1966April 15 to Oct. 150.74 cfs234.3 AF68.3 acresLease 1806, active, Jan. 1, 2024, to Dec. 31, 2028
22-14668PFG Idaho, LLCSept. 4, 1948April 15 to Oct. 310.30 cfs67.2 AF25.8 acres, shared with 22-14669None listed
22-14669PFG Idaho, LLCJune 1, 1961April 15 to Oct. 310.10 cfs23.2 AFSame 25.8 acresNone listed
22-14670PFG Idaho, LLCDec. 2, 1966April 15 to Oct. 150.70 cfs221.7 AF64.7 acresLease 1806, active, Jan. 1, 2024, to Dec. 31, 2028

Two pairs of rights share a place of use and an acreage limit. IDWR's reports state that rights 22-2128 and 22-10835 "are limited to the irrigation of a combined total of 239.2 acres in a single irrigation season," and that rights 22-14668 and 22-14669 "are limited to the irrigation of a combined total of 25.8 acres in a single irrigation season" (IDWR report 22-2128; IDWR report 22-14668). The 2025 deed that conveyed PFG Idaho's portions describes the portions that are now 22-14668 and 22-14669 as "a combined total of 25.8 acres and 0.30 cfs" (deed, Instr. 290685, June 6, 2025, p. 2). Read with that limit, PFG Idaho's three Section 29 rights total 1.00 cfs: 0.30 cfs for 22-14668 and 22-14669 together and 0.70 cfs for 22-14670.

For the two rights in the Water Supply Bank, IDWR's report for 22-2281 lists the lease as covering 1.44 cfs, 456 acre-feet and 133 acres of irrigation (IDWR report 22-2281). IDWR's July 9, 2025, letter to PFG Idaho says 22-14670 "is also leased to the Bank" until "December 31, 2028 unless released earlier" (IDWR ownership-change file for PFG Idaho, p. 25). IDWR's 2025 records also listed part of 22-2128 and 22-10835 under a second Water Supply Bank lease, No. 1807, active through Dec. 31, 2028, for 0.26 cfs on 16.4 acres of 22-2128 and 0.09 cfs on 5.6 acres of 22-10835 (IDWR ownership-change file for Teton Valley Water, pp. 8, 12-13); the reports for those two rights checked Nov. 18, 2026, list no lease.

How the rights changed hands in 2025

DateWhat the record showsSource
May 22 and June 16, 2025McCulloch Ranches LLC deeds the land to 862 Teton LLC, "a Texas limited liability company," in two warranty deeds, Instruments 290683 and 290684.IDWR ownership-change file for 862 Teton, pp. 2, 11
June 18, 2025Lawrence Wayne Powell, as manager of PFG Idaho, LLC, signs a notice of change in ownership for the company's portions of the rights. IDWR now records those portions as rights 22-14668, 22-14669 and 22-14670, held by PFG Idaho.IDWR ownership-change file for PFG Idaho, p. 1; IDWR reports above
July 3, 2025IDWR records the rights' change in ownership from McCulloch Ranches, LLC to 862 Teton, LLC.IDWR letter, July 3, 2025, in the 862 Teton ownership-change file, p. 20
Sept. 19, 2025Teton County records Instrument 292111, a quitclaim deed dated September 2025 in which 862 Teton, LLC (signed by George Allen, manager) conveys water rights "22-2128, 22-2281, 22-10835" to Teton Valley Water, LLC.IDWR ownership-change file for Teton Valley Water, p. 2

The three ownership-change files are listed on IDWR's public document lists for each right, for example the list for 22-2128.

A pending transfer of two of the rights

Teton County Properties, LLC, of Lake Jackson, Texas, has applied to IDWR to change "0.26 cfs and/or 4.5 af" of rights 22-2128 and 22-10835 to points of diversion in Township 4 North, Range 45 East, Section 22, with a place of use in Sections 21 and 22 and uses of irrigation, diversion to storage and wildlife storage (Transfer No. 90613 application, pp. 1, 4-5). A letter in the file says Teton County Properties "has entered into a purchase agreement with Rocky Mountain Water Exchange, LLC" for the rights "in the amount of 22 acres," and a consent letter from Teton Valley Water, signed by George Allen as manager, says transfer applications "may be filed by potential buyers" (application, pp. 9-10). The legal notice set the protest deadline at Oct. 13, 2026 (affidavit of publication, p. 2). IDWR's document list for 22-2128, checked Nov. 18, 2026, shows the application, the affidavit of publication and a Sept. 16 request for the watermaster's recommendation, and no decision (IDWR document list for 22-2128).

Water for the development

At the City Council hearing on Oct. 14, 2025, the minutes record that "Pinnacle Peaks plans to bring addition water rights to the City to help provide drinking water" and that "They also plan to contribute a new well for the City water infrastructure" (City Council minutes, Oct. 14, 2025, p. 2). The applicant's 2025 narrative says that "Pinnacle Peak currently has 1.0 CFS in ground water rights that are roughly equal to 528 EDUs," that "A portion of the existing Pinnacle Peak water rights will be conveyed to the City of Tetonia," and that "Pinnacle Peak also has additional water rights that are available to us for purchase if needed by the city of Tetonia" (narrative, p. 3). An economic impact report prepared for Powell Family Group says the project "will also dedicate 136.5 acres of water rights totaling 1.5 CFS" (TischlerBise, Dec. 23, 2025, p. 7). The applicant's draft development agreement would have the city reserve water system capacity "for the exclusive use of the Development" equal to the water rights and infrastructure the developer contributes (draft development agreement, § 8). The same draft counts as “Recoverable Infrastructure Costs” “the cost of acquiring real property and interests in real property (including fee title, easements, rights-of-way, leases, and water rights) used or useful for, or dedicated or made available to, the City’s water and/or sewer systems,” costs the developer would recover through a credit of 75 percent of each water and sewer connection fee (§ 4.2(a)(ii), (b)).

On Sept. 30, 2026, the City Council adopted Ordinance 2026-09 on drinking water capacity and water rights requirements for future development (council minutes, p. 1). The city engineer's Nov. 12, 2026, review asks the applicant for a Water Rights Mitigation Plan that identifies "the rights, usable pumping rate, annual volume, required approvals, and timing" (engineer's review, p. 3). The applicant answered on Nov. 19 that the plan "will be provided upon receipt of the City’s adopted ordinance. This document has been requested by PFG buy [sic] has not yet been provided" (response worksheet, p. 7). The text of the ordinance, as provided by the city clerk, requires mitigation for developments that create or are estimated to create demand exceeding two equivalent dwelling units "or all annexations," and lists conveying water rights to the city among the measures the City Council may approve (Ordinance No. 2026-09, as provided by the City of Tetonia clerk, Nov. 19, 2026, pp. 2-3; the ordinance's provisions).

IDWR's water right reports, checked Nov. 18 and 19, 2026, record all six rights for irrigation. Changing a water right's nature of use, place of use or point of diversion takes a transfer application to IDWR under Idaho Code 42-222, which provides for public notice and protests; the legal notice for No. 90613 states that "Protests may be submitted based on the criteria of Idaho Code Sec. 42-222" (affidavit of publication, p. 2; IDWR transfer application form, p. 1). This page is general information and is not legal advice.

Water promised and water held

"AF" is acre-feet a year.

What the applicant's documents say would go to the city

DocumentDateWhat it saysSource
Rezone and conditional use permit narrative, submitted on behalf of Powell Family Group - Idaho Undated; the file name gives Aug. 21, 2025 "A portion of the existing Pinnacle Peak water rights will be conveyed to the City of Tetonia. Pinnacle Peak currently has 1.0 CFS in ground water rights that are roughly equal to 528 EDUs." "Pinnacle Peak also has additional water rights that are available to us for purchase if needed by the city of Tetonia." narrative, p. 3
Annexation and rezone narrative, AX2026-3 Stamped received Oct. 9, 2026 "As part of this commitment, Pinnacle Peak will convey a full 1.0 CFS of water rights to the City of Tetonia." Its utilities table lists "Existing Ground Water Rights" as "1.0 CFS (≈ 528 EDUs) — full 1.0 CFS to be conveyed to the City of Tetonia" and "Additional Water Rights" as "Available for purchase by Pinnacle Peak if needed." annexation narrative, p. 10; p. 11
City Council minutes, hearing on the rezone and conditional use permit Oct. 14, 2025 "Pinnacle Peaks plans to bring addition water rights to the City to help provide drinking water. They also plan to contribute a new well for the City water infrastructure." minutes, p. 2
Impact analysis report by TischlerBise, submitted to Powell Family Group Dec. 23, 2025 "Pinnacle Peaks will dedicate 1.5 CFS which is 136.6 acres of water rights." Its Figure 23 lists 1.5 cubic feet per second and 136.6 "Acres of Water Right." The report's summary, on p. 7, says "Pinnacle Peaks will also dedicate 136.5 acres of water rights totaling 1.5 CFS." TischlerBise, p. 22; p. 23; p. 7
Draft development agreement for Phase 1, filed with the preliminary plat; unsigned Date left blank ("the ______ day of _______________, 2026") "In consideration of the water rights and water infrastructure made available to the City by the Developer and its affiliates in support of the City's municipal water system, including as contemplated by the Annexation Agreement, the City shall reserve for the exclusive use of the Development and the Property a quantity of municipal water system capacity equal to the capacity attributable to the water rights and infrastructure so contributed (the 'Reserved Capacity')." draft development agreement, § 8 (a Word file, cited by section)

What the water right records show

HolderRightsRateVolumeAcresNotesSource
862 Teton LLC, before the July 9, 2025, split 22-2128 3.08 cfs 690.0 AF 265.0 IDWR report dated July 3, 2025. 22-2128 and 22-10835 were "limited to a total combined diversion rate of 3.08 cfs" and "a combined total of 265 acres." Irrigation, April 15 to Oct. 31. IDWR report for 22-2128, July 3, 2025, p. 4; p. 5; holder: IDWR letter, July 3, 2025, p. 20
862 Teton LLC, before the split 22-10835 1.06 cfs 238 AF Same 265 acres as 22-2128 From a "Water Right Split Analysis" table dated June 12, 2025, filed with PFG Idaho's notice of change in ownership; the map that follows it carries the title block of Rocky Mountain Environmental Associates. No IDWR report for this right before the split is posted here. Irrigation. split table in the IDWR ownership-change file for PFG Idaho, p. 2; map, p. 3; holder: IDWR letter, p. 20
862 Teton LLC, before the split 22-2281 1.44 cfs 456 AF 133 From the same split table. No IDWR report for this right before the split is posted here. IDWR's current report for 22-2281 lists Water Supply Bank lease 1806 as covering 1.44 cfs, 456 acre-feet and 133 acres. Irrigation. split table, p. 2; IDWR report 22-2281, Nov. 18, 2026, p. 2; holder: IDWR letter, p. 20
PFG Idaho, LLC 22-14668 0.30 cfs 67.2 AF 25.8, shared with 22-14669 Split from 22-2128. 22-14668 and 22-14669 are "limited to a total combined diversion rate of 0.30 cfs." Irrigation, April 15 to Oct. 31. IDWR report 22-14668, p. 1; p. 2; split: IDWR letter, July 9, 2025, p. 25
PFG Idaho, LLC 22-14669 0.10 cfs 23.2 AF Same 25.8 acres Split from 22-10835. Same 0.30 cfs combined limit. Irrigation, April 15 to Oct. 31. IDWR report 22-14669, p. 1; p. 2; split: IDWR letter, July 9, 2025, p. 25
PFG Idaho, LLC 22-14670 0.70 cfs 221.7 AF 64.7 Split from 22-2281. IDWR's July 9, 2025, letter says the right "is also leased to the Bank" and will remain there until "December 31, 2028 unless released earlier by the Water Resource Board or upon request by the right holder." The current report lists lease 1806, active, ending Dec. 31, 2028. Irrigation, April 15 to Oct. 15. IDWR report 22-14670, p. 1; p. 2; split and lease: IDWR letter, July 9, 2025, p. 25
PFG Idaho, LLC, total in Section 29 22-14668, 22-14669, 22-14670 1.00 cfs, read with the 0.30 cfs combined limit (0.30 + 0.70) 312.1 AF (67.2 + 23.2 + 221.7) 90.5 (25.8 + 64.7) The split table's totals row lists 1.00 cfs, 312.1 acre-feet and 90.5 acres for PFG Idaho. split table, p. 2; IDWR reports in the rows above
Teton Valley Water, LLC 22-2128 2.78 cfs 622.8 AF 239.2, shared with 22-10835 22-2128 and 22-10835 are "limited to a total combined diversion rate of 2.78 cfs." Irrigation, April 15 to Oct. 31. IDWR report 22-2128, Nov. 18, 2026, p. 1; p. 2
Teton Valley Water, LLC 22-10835 0.96 cfs 214.8 AF Same 239.2 acres Same 2.78 cfs combined limit. Irrigation, April 15 to Oct. 31. IDWR report 22-10835, p. 1; p. 2
Teton Valley Water, LLC 22-2281 0.74 cfs 234.3 AF 68.3 Lease 1806, active, ending Dec. 31, 2028. Irrigation, April 15 to Oct. 15. IDWR report 22-2281, p. 1; p. 2
Teton Valley Water, LLC, total 22-2128, 22-10835, 22-2281 3.52 cfs, read with the 2.78 cfs combined limit (2.78 + 0.74) 1,071.9 AF (622.8 + 214.8 + 234.3) 307.5 (239.2 + 68.3) The split table's totals row lists 3.52 cfs, 1,071.9 acre-feet and 307.5 acres for the portion then held by 862 Teton, which conveyed these three rights to Teton Valley Water by a quitclaim deed recorded Sept. 19, 2025. split table, p. 2; IDWR ownership-change file for Teton Valley Water, p. 2

The arithmetic below is ours, from the figures in the two tables. PFG Idaho's three Section 29 rights total 1.00 cfs, the same figure as the annexation narrative's "full 1.0 CFS." The TischlerBise figure of 1.5 cfs is 0.50 cfs more (1.5 − 1.00 = 0.50), and the TischlerBise report's 136.6 acres (136.5 on p. 7) compares with the 90.5 acres under those three rights (25.8 + 64.7). One cubic foot is 7.48 gallons, so 1.0 cfs is 448.8 gallons a minute (7.48 × 60 seconds). Over a full day that is 646,272 gallons (448.8 × 1,440 minutes), and spread over 528 EDUs it is about 1,224 gallons a day per EDU (646,272 ÷ 528). For comparison, the city engineer's Nov. 12, 2026, review uses 148 gallons a day per ERU for sewer flow (engineer's review, sewer comment S02, p. 1), and the applicant's July 14, 2026, water report uses 800 gallons a day per household for residential water demand, which for 150 homes is 120,000 gallons a day, the report's peak-day flow; its average-day flow is 60,000 gallons (Eagle Rock Engineering water report, p. 3). The applicant’s Nov. 18 water report replaces it and uses the city study’s “0.39 gpm = 1 ERU,” or 58.5 gallons a minute for 150 units (Nov. 18 water report, p. 3). None of the records on this page identifies by number which water rights would go to the city, for the 1.0 cfs or the 1.5 cfs. IDWR's reports for all six rights, checked Nov. 18 and 19, 2026, list irrigation as each right's use and PFG Idaho or Teton Valley Water as its holder, and the 10 entries shown on each of IDWR's posted document lists for 22-2128, 22-10835 and 22-2281, of 42, 37 and 41 entries, include no transfer to the city or to municipal use (22-2128 list, pp. 1-3; 22-10835 list, pp. 1-3; 22-2281 list, pp. 1-3); no document list for PFG Idaho's three Section 29 rights was captured.