Pinnacle Peak public record

Comments due Nov. 30, 5 p.m.

Documents

These are the 129 records posted with this site, including each record its pages cite. Each has a page of its own on The Valley Signal. Personal details of private people, such as home addresses, personal phone numbers and personal email addresses, are removed from the posted copies, along with a tax identification number on a W-9 form and notary commission numbers; each removal is logged.

City of Tetonia (78)

Records the city produced or holds in its file, including the applicant's filings and agency comments it received.

DateDocumentWhat it shows
Nov. 19, 2026Pinnacle Peak response worksheet to fire district and city engineer comments, received Nov. 19, 2026The applicant's answers, item by item, to the fire district's Oct. 22 comments and Sunrise Engineering's Nov. 12 review. It defers the water rights mitigation plan, the source-capacity and hydraulic studies and the developer's share of sewer improvements.
Nov. 19, 2026Pinnacle Peak preliminary plat, revised Nov. 19, 2026Eagle Rock Engineering's revised four-sheet plat: 90 single-family lots and 60 townhome units, two open-space lots to be dedicated to the city in place of four, a 10-foot pathway and a pressure irrigation system owned by the homeowners association.
Nov. 19, 2026Pinnacle Peak renderings, revised Nov. 19, 2026The applicant's 19-page rendering set. Compared with the Oct. 9 set, it drops the dog park parking lot and roundabout views and adds an aerial view of the townhouse blocks and a view of a pathway between homes.
Nov. 18, 2026Eagle Rock Engineering preliminary water report for Pinnacle Peak, Nov. 18, 2026Draft report by the applicant's engineer, using the city's water study: 0 ERUs available before upgrades, and 400 gpm of new water rights and a 475,000-gallon tank required. Replaces the July 14 report.
Nov. 18, 2026Eagle Rock Engineering preliminary sanitary sewer report for Pinnacle Peak, Nov. 18, 2026Draft report by the applicant's engineer, using the city's wastewater study: 88 ERUs available before upgrades, and Phase 3 will exceed them and need a new aerator. Replaces the July 14 report.
Nov. 18, 2026Tetonia P&Z hearing notice on the Pinnacle Peak preliminary plat, Dec. 7, 2026Notice of the P&Z's Dec. 7, 2026, hearing on the Pinnacle Peak preliminary plat dividing about 38 acres (parcel RPC00000291201) into 90 single-family and 60 townhouse lots, applicant David Ferrette for PFG Idaho LLC. Comments due Nov. 30.
Nov. 16, 2026Tetonia planner's review of the Pinnacle Peak at the Tetons preliminary plat, Nov. 16, 2026Contract planner Ashley Koehler's memo to the city clerk with 60 numbered comments on the preliminary plat, including a Phase 1 road link to the city grid, Rail Trail easements before the subdivision proceeds and still-pending ITD comments.
Nov. 12, 2026Sunrise Engineering review of the Pinnacle Peak at the Tetons preliminary plat, Nov. 12, 2026City engineer Robert Heuseveldt's numbered comments on sewer, water, drainage, transportation and parks, requiring a water rights mitigation plan and stating plat approval does not reserve sewer or water capacity for all 150 units.
Nov. 10, 2026Sunrise Engineering draft Tetonia future land use map, Nov. 10, 2026Sunrise Engineering's future land use planning map for Tetonia's comprehensive plan amendment, showing proposed agricultural and scenic, civic, gateway commercial, industrial, residential and pedestrian mixed-use areas.
Nov. 2, 2026Tetonia Planning and Zoning Commission regular meeting agenda, Nov. 2, 2026Agenda for the Nov. 2, 2026, P&Z meeting with work sessions on the Pinnacle Peak preliminary plat ('additional information needed') and the city's comprehensive plan amendment draft and future land use map.
Oct. 30, 2026Pinnacle Peak preliminary plat with Tetonia planner's comments, Oct. 30, 2026Applicant's four-sheet preliminary plat by Eagle Rock Engineering, received Oct. 9, 2026, marked up by contract planner Ashley Koehler, flagging Lucas Lane straddling city limits, Rail Trail permission and a 2nd Street link.
Oct. 28, 2026Tetonia staff report on the Pinnacle Peak at the Tetons preliminary plat, Oct. 28, 2026Contract planner's initial review of the revised plat for the Nov. 2, 2026, P&Z meeting: application history, the timeline setting the Dec. 7 hearing, and open items including townhouse acreage, the Rail Trail easement and water.
Oct. 13, 2026Method Studio master plan drawing for Pinnacle Peak at the Tetons, received Oct. 13, 2026Applicant's site plan for the full project over an aerial photo: C-3 159.35 acres with the ballfield complex, C-2 104.45, R-3 107.77 and M-2 28.68 acres, plus a parcel marked 'PUBLIC.'
Oct. 9, 2026Powell Family Group alternative design plan for Pinnacle Peak block lengths, received Oct. 9, 2026The applicant's request under Tetonia code 9-12-04-4 to meet the 400-foot block-length rule in the 38-acre R-3 phase with a 60-foot landscape corridor at 462 feet, offered on top of required open space. Its closing note calls it a first-draft submission.
Oct. 9, 2026Pinnacle Peak annexation and rezone narrative, received Oct. 9, 2026The applicant's 14-page case for annexing and zoning the Pinnacle Peak land, pledging 1.0 cfs of water rights, street and park upkeep, no ballfield lighting and 3 acres for public use. It gives the acreage as both 399.26 and 400.25.
Oct. 9, 2026David Ferrette comprehensive plan amendment application to Tetonia, received Oct. 9, 2026City of Tetonia comprehensive plan amendment application filed by developer David Ferrette, referring to an attached narrative for the changes sought (AMD2026-1).
Oct. 9, 2026PFG Idaho comprehensive plan amendment narrative for Pinnacle Peak, Oct. 9, 2026The applicant's proposed changes to Tetonia's 2009 comprehensive plan and land use map, with commitments on 1.0 cfs of water rights, paving Perry Avenue, 3 acres for public buildings and Dark Sky lighting.
Oct. 9, 2026Draft development agreement for Pinnacle Peak Phase 1, received Oct. 9, 2026 (Word document)Unsigned draft development agreement the applicant filed for the 150-lot Phase 1, covering a 75% hook-up fee credit, reserved water capacity, upkeep limits, Perry Avenue paving and three affordable townhome lots.
Oct. 9, 2026Eagle Rock Engineering responses to the city's Pinnacle Peak preliminary plat review, received Oct. 9, 2026The city engineer's Aug. 20, 2026 review comments on the preliminary plat, including that the water system is at capacity, with the applicant's engineer's responses. The response date is left as 'xx-xx-26'.
Oct. 9, 2026Pinnacle Peak Subdivision preliminary plat, received Oct. 9, 2026Four-sheet preliminary plat by Eagle Rock Engineering for the applicant: 38.346 acres, 90 single-family lots, 60 multifamily units and 6 open-space lots in three phases, with road extensions through county land.
Oct. 9, 2026KLOA transportation planning study for the Pinnacle Peak master plan, Oct. 9, 2026KLOA's full-buildout study for Powell Family Group finds turn lanes and signals warranted on Highway 33 at Lucas Lane and Asher Park Lane by 2052, and projects level of service E or F on side streets along the highway.
Oct. 9, 2026PFG Idaho preliminary subdivision application for Pinnacle Peak at the Tetons, Oct. 9, 2026City of Tetonia preliminary plat application from PFG Idaho LLC for 150 lots on 38.346 acres (parcel RPC00000291201), average lot 8,510 sq. ft., with 183,946 sq. ft. of open space. Signed by David Ferrette Oct. 9, 2026.
Oct. 9, 2026Pinnacle Peak residential renderings, received Oct. 9, 2026The applicant's 20-page presentation of proposed homes, townhomes, exterior colors, floor plans, entrance sign, landscaping and common areas for the Pinnacle Peak subdivision.
Oct. 5, 2026Eagle Rock Engineering annexation survey map for Tetonia PFG, Oct. 5, 2026Survey exhibit for the City of Tetonia annexation showing Parcels 1-A, 1-B, 1-C and 2 in Section 29 with boundary descriptions; a note gives the total to be annexed as 400.25 acres.
Sept. 30, 2026Tetonia City Council special meeting minutes, Sept. 30, 2026Minutes recording adoption of Ordinance 2026-09, setting drinking water capacity and water rights requirements for future development (3-0, Hansen absent), approval of the drinking water facility planning study, and an Oct. 27 open house.
Sept. 17, 2026PFG Idaho annexation application to Tetonia, Sept. 17, 2026City of Tetonia annexation application from PFG Idaho LLC and 862 Teton LLC for 389.25 acres, asking for C-2, C-3, R-3 and M-2 zoning from county Transitional Agriculture. Signed Sept. 17, 2026; received Oct. 9, 2026 (AX2026-3).
Sept. 15, 2026Tetonia planner's memo for the P&Z work session on Pinnacle Peak, Sept. 15, 2026Contract planner's memo on the review process for the expanded Pinnacle Peak project with a baseball resort: annexation with a comprehensive plan amendment first or concurrently, and quasi-judicial limits on ex parte contact.
Sept. 11, 2026KLOA traffic impact study for Pinnacle Peak Phase I, Sept. 11, 2026KLOA study for Powell Family Group estimating 86 morning and 113 evening peak-hour trips and 1,388 daily trips from the 150-unit Phase I, and concluding it needs no road improvements or traffic signal.
Sept. 9, 2026City of Tetonia emails on public works concerns with the Pinnacle Peak plans, Sept. 4-9, 2026Email thread in which public works' Lee Barnes sent the contract planner his concerns on the Pinnacle plans, marked in red boxes, and the planner said she would pass comments to the applicant. The marked-up plans are not included.
Sept. 8, 2026Tetonia Resolution 2026-04 schedule of fees, Sept. 8, 2026City resolution adopting water, sewer, general and land-use application fees effective Oct. 1, 2026, including a $10,132 water hookup fee, an $8,463 sewer connection fee per EDU and a $94.70 monthly sewer fee per EDU.
Sept. 8, 2026Tetonia City Council regular meeting minutes, Sept. 8, 2026Minutes recording approval of fee Resolution 2026-04 and the wastewater facility planning study, and the city engineer's proposal to require new developments to contribute water rights under Title 7.
Sept. 8, 2026Tetonia amended FY2027 budget hearing notice, Sept. 8, 2026Amended legal notice of the Sept. 8, 2026, hearing on the city's FY2027 budget, proposing $665,535 in total spending, including $187,164 for water and $267,528 for sewer, with water revenue shown at $160,640.
Aug. 26, 2026Eagle Rock Engineering legal description for the Tetonia PFG annexation, Aug. 26, 2026Metes-and-bounds descriptions of the annexation parcels in Section 29: part of Parcel 1-A (190.267 acres), 1-B (29.852), 1-C (32.683) and Parcel 2 (136.449). Filed with the annexation application.
Aug. 25, 2026Tetonia City Council special meeting minutes, Aug. 25, 2026Minutes recording the council's 3-1 vote, Hansen voting no, to pursue judicial confirmation for a new 475,000-gallon concrete water tank at about $2.29 million.
Aug. 20, 2026Sunrise Engineering review of the Pinnacle Peak preliminary plat, Aug. 20, 2026City engineer Merril Quayle's review of the first preliminary plat submittal, requiring a Perry Avenue connection and state approval for Rails-to-Trails crossings, and stating the water distribution system 'currently is at capacity.'
Aug. 19, 2026KLOA traffic impact study for the National Parks Baseball Resort, Aug. 19, 2026KLOA study for the National Parks Baseball Resort estimating 170 weekday and 130 and 70 Saturday peak-hour trips for the 18-field complex and finding no road work needed beyond what the Pinnacle Peak master plan proposes.
Aug. 11, 2026Tetonia City Council special and regular meeting minutes, Aug. 11, 2026Minutes recording Ordinance 2026-06, correcting the parcel number in the Pinnacle Peak rezone ordinance (3 ayes, Hansen abstaining), the tabling of the wastewater study, and Sunrise's drinking water study amendment and tank options.
Aug. 6, 2026Eagle Rock Engineering preliminary drainage report for Pinnacle Peak Subdivision, Aug. 6, 2026The applicant's engineer proposes retaining and infiltrating all stormwater on the 38.346-acre, 150-unit plat, with 69,245 cubic feet of storage for the 100-year storm. Copy filed with the plat application.
July 14, 2026Eagle Rock Engineering sanitary sewer report for Pinnacle Peak Subdivision, July 14, 2026Draft report by the applicant's engineer on sewer capacity for the 150-unit subdivision, estimating 22,000 gallons a day of average flow and 90,724 at peak, and listing "57,130 gpd (386 ERU's)" as remaining capacity. Copy filed with the preliminary plat application. Replaced by the Nov. 18, 2026, report, which lists 88 ERUs available before upgrades instead.
July 14, 2026Eagle Rock Engineering water report for Pinnacle Peak Subdivision, July 14, 2026Draft report by the applicant's engineer estimating water demand for the 150-unit subdivision at 60,000 gallons a day on average and 180,000 at peak hour, with 1,500 gpm fire flow. Copy filed with the preliminary plat application. Replaced by the Nov. 18, 2026, report.
July 14, 2026Tetonia City Council special and regular meeting minutes, July 14, 2026Minutes in which Sunrise presented the draft wastewater facility planning study without a vote, the council took up the Rails to Trails easement appraisal, and the FY2027 preliminary budget was adopted.
June 23, 2026Tetonia City Council special meeting and work session minutes, June 23, 2026Minutes in which Sunrise Engineering's Laura Radke presented water tank options and recommended replacing the 100,000-gallon tank with one 450,000-gallon tank, and Merril Quayle presented the draft water and sewer fee study.
June 22, 2026Tetonia Planning and Zoning Commission special meeting agenda, June 22, 2026Agenda for a special P&Z meeting with one item, a temporary use permit for a July 8, 2026, concert in Ruby Carson Memorial Park, applicant Josh Weltman. It has no Pinnacle Peak item.
June 16, 2026Tetonia P&Z hearing notice on a 4.66-acre R-1 to C-2 rezone, July 6, 2026 hearingNotice of the P&Z's July 6, 2026, hearing on rezoning 4.66 acres west of Highway 33 from R-1 to C-2 for up to five live/work buildings with about 46 homes. David Ferrette applies for owner PFG Idaho LLC as part of Pinnacle Peak.
May 21, 2026KLOA traffic impact study for Pinnacle Peak Phase I, May 21, 2026Traffic study by Kenig, Lindgren, O'Hara, Aboona Inc. for Powell Family Group on Phase I, received by the city July 15, 2026, and posted in the application's impact-studies folder. The Sept. 11, 2026, Phase I study followed it.
May 21, 2026Sunrise Engineering draft Tetonia wastewater facilities planning study, May 2026Technical draft of the city engineer's wastewater study, finding the system at 201 ERUs, setting upgrade thresholds at 289, 339, 433 and 587 ERUs, and estimating Treatment Option 1 at $9,667,734. Marked draft.
May 12, 2026Tetonia City Council regular meeting minutes, May 12, 2026Minutes in which ALTURA reported the city ranked for a $1.2 million DEQ loan for drinking water upgrades, naming a bond election or judicial confirmation as next steps.
April 14, 2026Tetonia City Council regular meeting minutes, April 14, 2026Minutes in which the draft fee schedule was held until the water and sewer fee study arrives, Harmony Design presented on impact fees, and the council took up the Mt. Nord subdivision recommendation.
March 10, 2026Tetonia City Council regular meeting minutes, March 10, 2026Minutes recording approval of Sunrise Engineering's crossroad specifications and up to $4,100 for sewer lagoon aerator motors, and a plan to ask other engineers on the city's roster for impact-fee proposals.
Feb. 16, 2026Tetonia planner's concept review of the Pinnacle Peak subdivision, with applicant responses, Feb. 16, 2026Contract planner Ashley Koehler's concept review finding the 90-home, 60-townhouse plan did not conform on block layout, open space and road links, with fire, health and engineer comments. Applicant responses are added in red.
Feb. 10, 2026Tetonia City Council regular meeting minutes, Feb. 10, 2026Minutes in which Sunrise Engineering proposed a 60-foot right of way in place of the 82.5-foot collector street standard and Clearwater Financial presented on impact fees.
Jan. 13, 2026Tetonia City Council regular meeting minutes, Jan. 13, 2026Minutes recording the council's decision not to consider a Dec. 24, 2025, request for reconsideration of the Pinnacle Peak rezone and CUP as untimely, with Hansen recused, plus plans for a comprehensive plan open house.
Dec. 23, 2025TischlerBise impact analysis of the Pinnacle Peaks development, Dec. 23, 2025Report by TischlerBise for Powell Family Group projecting 780 homes, 654,210 sq. ft. of commercial space, 1,512 residents and 1,184 jobs over 20 years. It projects revenues only, with no city costs.
Dec. 9, 2025Tetonia City Council regular meeting minutes, Dec. 9, 2025Minutes recording the 3-0 roll-call adoption of Rezone Ordinance 2025-06 for Pinnacle Peak, a city engineer update on the area of impact that would cut out the rodeo grounds, and a first impact-fee discussion.
Dec. 9, 2025Tetonia notice of decision on the Pinnacle Peak rezone and CUP, Dec. 9, 2025City findings, conclusions and decision approving the rezone of about 38 acres from TA to R-3 and a CUP for single-family homes, each void or reverting to TA if a subdivision application is not filed by April 14, 2027.
Nov. 12, 2025Tetonia City Council hearing notice on area-of-impact code amendments, Nov. 12, 2025Notice of the council's Nov. 12, 2025, public hearing on amendments to the city's Area of Impact regulations, boundary and zone map, with written comments due Nov. 6. Published Oct. 22, 2025.
Nov. 12, 2025Tetonia City Council special meeting minutes, Nov. 12, 2025Minutes of the council's area-of-impact hearing, with no public comment, and a motion to recommend the AOI ordinance to Teton County. Rezone Ordinance 2025-06 for Pinnacle Peak was tabled.
Nov. 12, 2025Tetonia City Council special meeting agenda, Nov. 12, 2025Agenda for the council's special meeting with a public hearing on area-of-impact regulations and zoning, an action item on the AOI recommendation to Teton County, and Rezone Ordinance 2025-06.
Nov. 3, 2025Tetonia Planning and Zoning Commission regular meeting agenda, Nov. 3, 2025Agenda for the Nov. 3, 2025, P&Z meeting: approval of Sept. 8 minutes, a public hearing on Joe Calder's R1-to-C1 rezone on Letham and Leigh avenues, and a code interpretation on campgrounds. It has no Pinnacle Peak item.
Nov. 3, 2025Tetonia Planning and Zoning Commission regular meeting minutes, Nov. 3, 2025Minutes of the P&Z meeting at which commissioners asked that impact fees be discussed with the council because the city lacks the services to absorb development impacts; the rest covers a private rezone request and a code interpretation on campgrounds.
Oct. 14, 2025Tetonia City Council regular meeting agenda, Oct. 14, 2025Agenda for the council meeting with public hearings and action items on the Pinnacle Peak rezone and conditional use permit, plus a Sunrise Engineering drinking water study action item and growth projection discussion.
Oct. 14, 2025Tetonia City Council hearing notice on the Pinnacle Peak rezone and CUP, Oct. 14, 2025Notice of the council's Oct. 14, 2025, hearing on rezoning 38 acres (parcel RPC00000291200) from Transitional Agricultural to R-3, with a conditional use permit to plat up to 90 single-family homes. Comments were due Oct. 7.
Oct. 14, 2025Tetonia City Council regular meeting minutes, Oct. 14, 2025Minutes of the council hearing that approved the Pinnacle Peak rezone to R-3 and the conditional use permit, each 3-1 with Rasmussen voting no, on condition a subdivision application is filed within 18 months.
Sept. 19, 2025Record of survey of the McCulloch property, Section 29, recorded Sept. 19, 2025Recorded survey by AW Engineering of four McCulloch parcels totaling 622.72 acres around Tetonia, Teton County instrument 292121, filed with the Pinnacle Peak applications as a reference.
Sept. 8, 2025Tetonia P&Z hearing notice on area-of-impact code amendments, Sept. 8, 2025Notice of the Planning and Zoning Commission's Sept. 8, 2025, public hearing on city-initiated amendments to the Area of Impact regulations, boundary and zone map. Written comments were due by 5 p.m. Sept. 1.
Sept. 8, 2025Tetonia Planning and Zoning Commission special meeting minutes, Sept. 8, 2025P&Z minutes: with no public comment, the commission recommended the Pinnacle Peak rezone and CUP with a one-year subdivision-application condition, and separately recommended the area-of-impact ordinance. The posted copy is unfinished ('ADD public that signed in').
Sept. 3, 2025Tetonia staff report on the Pinnacle Peak rezone and CUP, Sept. 3, 2025Contract planner's memo for the P&Z's Sept. 8, 2025, hearing on rezoning 38.25 acres to R-3, recommending a one-year condition. Attached: the applicant's narrative stating Pinnacle Peak has 1.0 cfs of groundwater rights and the city engineer's letter.
Sept. 2, 2025Sunrise Engineering review of the Pinnacle Peak concept plan for the rezone and CUP, Sept. 2, 2025City engineer Robert Heuseveldt's letter: about 100 sewer and water connections remain, issued first come, first served with building permits, which appears enough for the development, to be verified in facility plan updates. It also calls for a water-rights assessment.
Aug. 13, 2025Tetonia Planning and Zoning Commission special meeting minutes, Aug. 13, 2025Minutes of a P&Z special meeting, including a work session on the city's area-of-impact code amendments where commissioners asked why the area should include land the city cannot serve and discussion ended on water availability.
July 15, 2025PFG Idaho conditional use permit application to Tetonia, July 15, 2025City of Tetonia conditional use permit application from PFG Idaho LLC for 38.25 acres in the SW1/4NE1/4 of Sec. 29, T6N R45E, listing R3 as the proposed zoning (current zoning Transitional Agriculture), with Johnny Watson as representative.
July 15, 2025PFG Idaho rezone application to Tetonia, July 15, 2025City of Tetonia rezone application from PFG Idaho LLC for 38.25 acres, Transitional Agriculture to a zone written as 'MU', filed with a related conditional use permit; Johnny Watson is the representative.
June 5, 2025Tetonia Planning and Zoning Commission special meeting minutes, June 5, 2025Minutes of a special P&Z meeting that approved, with seven conditions, a temporary use permit for a July 12 concert in Ruby Carson City Park. No Pinnacle Peak, water or sewer item was on it.
Jan. 21, 2025Sunrise Engineering contract for Tetonia's comprehensive plan update, signed Jan. 21, 2025Sunrise Engineering's Dec. 5, 2024, proposal and agreement to prepare a new comprehensive plan for Tetonia for a $31,900 lump-sum fee, with public involvement, drafting and adoption phases. Mayor Brent Schindler signed it Jan. 21, 2025.
UndatedDraft Pinnacle Peak annexation agreement, undated (Word document)Unsigned draft annexation agreement between Tetonia and 862 Teton LLC, Teton Commercial Holdings LLC and PFG Idaho LLC for about 389 acres, with parcel zoning, a $500,000 connection fee and a phasing map.
UndatedTischlerBise one-page summary of Pinnacle Peaks development impactsOne-page graphic by the applicant's consultant TischlerBise listing projected fees, tax revenue, 1,184 jobs and 654,210 sq. ft. of commercial space, and saying 470 of 780 units would have 'more attainable value.'
UndatedPinnacle Peak rezone and conditional use permit narrative, undated (file name dated Aug. 21, 2025)The applicant's 2025 narrative for rezoning the 38-acre first phase, proposing up to 100 homes on existing city sewer and water capacity, with a second phase only after agreement on upgrades and water right transfers.
UndatedPinnacle Peak Parcel 3 rezone map and lot layout, undated (file name dated Aug. 21, 2025)Applicant's map of the 38.35-acre Parcel 3 proposed for R-3 high-density residential zoning, showing 22.44 acres of single-family lots and 11.22 acres of townhouses, with the parcel's legal description. Marked 'City of Tetonia version.'
UndatedPinnacle Peak Parcel 3 rezone vicinity mapTwo applicant maps for the R-3 rezone of the 38.35-acre Parcel 3: a vicinity map and a version drawn over the McCulloch record of survey showing Parcels 1-A through 4 next to Tetonia.

Teton County Recorder (12)

Recorded deeds, a 2022 mortgage and its partial release, and screenshots of the recorder's document viewer.

DateDocumentWhat it shows
Sept. 8, 2025Teton County quitclaim deed 292111, 862 Teton LLC to Teton Valley Water LLC, Sept. 8, 2025Recorder's copy of a quitclaim deed in which 862 Teton LLC, signed by George Allen, transfers water rights 22-2128, 22-2281 and 22-10835 to Teton Valley Water LLC, both at the same Dallas address. Recorded Sept. 19, 2025.
June 6, 2025Teton County warranty deed 290685, 862 Teton LLC to PFG Idaho LLC, June 6, 2025Warranty deed in which 862 Teton LLC conveys three tracts in Sec. 29, T6N R45E, to PFG Idaho LLC with 0.30 cfs of rights 22-2128/22-10835 (25.8 acres) and 0.70 cfs of 22-2281 (64.7 acres), reserving the rest. Recorded June 20, 2025.
June 6, 2025Teton County warranty deed 290686, 862 Teton LLC to Teton Commercial Holdings LLC, June 6, 2025Warranty deed in which 862 Teton LLC conveys Tax #1246 in Sec. 29, T6N R45E, to Teton Commercial Holdings LLC. All water rights, including 22-2128 and 22-10835, are reserved to the grantor. Recorded June 20, 2025.
May 22, 2025Teton County warranty deed 290683, McCulloch Ranches LLC to 862 Teton LLC, May 22, 2025Warranty deed in which McCulloch Ranches LLC, signed by manager Christopher M. Poch, conveys land in Sec. 29, T6N R45E, including Tax #1246, to 862 Teton LLC of Dallas. Recorded June 20, 2025.
May 21, 2025Teton County warranty deed 290723, 862 Teton LLC to HE Idaho Ventures LLC, May 21, 2025Recorder's copy of a warranty deed in which 862 Teton LLC conveys Lots 10 and 11, Block 1, Teton Valley Ventures Subdivision Division 2, to HE Idaho Ventures LLC of Alabama. Recorded June 24, 2025.
March 3, 2025Teton County corrected warranty deed 289919/289986, 862 Teton LLC to Teton Rainbow Ranches Inc., March 3, 2025Recorder's copy of the re-recorded warranty deed (289986, recorded April 29, 2025, to correct Parcel 5's legal description). In it, 862 Teton LLC conveys land and 240.8 irrigated acres of water rights 22-14496 through 22-14504 to Teton Rainbow Ranches Inc. of Victor.
March 3, 2025Teton County warranty deed 289919, 862 Teton LLC to Teton Rainbow Ranches Inc., March 3, 2025Recorder's copy of the original warranty deed, recorded April 23, 2025. In it, 862 Teton LLC conveys land and 240.8 irrigated acres of water rights 22-14496 through 22-14504 to Teton Rainbow Ranches Inc.
Nov. 4, 2022Teton County warranty deed, 862 Teton LLC to C2H2 Land Ventures LLC, Nov. 4, 2022Recorder's copy of a warranty deed in which 862 Teton LLC conveys Gov. Lot 2, Sec. 7, T4N R45E, to C2H2 Land Ventures LLC of Tennessee. Recorded Nov. 21, 2022.
Sept. 13, 2022Teton County partial satisfaction of mortgage 277888, Dominion Bank, Sept. 13, 2022Recorder's copy of Dominion Bank's partial release of its $4 million July 2022 mortgage from 862 Teton LLC (Instr. 276728), freeing the NW1/4NE1/4 and NE1/4NW1/4 of Sec. 7, T4N R45E. Recorded Sept. 26, 2022.
Aug. 24, 2022Teton County warranty deed 277699, 862 Teton LLC to L J Martin Ranch LLC, Aug. 24, 2022Recorder's copy of a warranty deed in which 862 Teton LLC conveys the NW1/4NE1/4 and NE1/4NW1/4 of Sec. 7, T4N R45E, to L J Martin Ranch LLC. Recorded Sept. 9, 2022.
July 8, 2022Teton County mortgage 276728, 862 Teton LLC to Dominion Bank, July 8, 2022Recorder's copy of the first page of a mortgage from 862 Teton LLC to Dominion Bank (Dallas) on property 'commonly known as 742 Acres, Driggs, ID 83422.' Recorded July 8, 2022.
June 21, 2022Teton County warranty deed 276727, Alex and Whitney Murray to 862 Teton LLC, June 21, 2022Recorder's copy of the first page of a warranty deed in which Alex S. Murray and Whitney A. Murray convey Teton County land to 862 Teton LLC. The legal description is on an exhibit not shown. Recorded July 8, 2022.

Idaho Department of Water Resources (20)

Water right reports, ownership-change files and Transfer No. 90613.

DateDocumentWhat it shows
Nov. 18, 2026IDWR related-documents list for water right 22-10835, Nov. 18, 2026IDWR's document index for water right 22-10835; the captured page shows the first 10 of 37 entries, including 2025 ownership-change filings, the July 2025 split report and Water Supply Bank lease filings. No transfer filing is among those 10.
Nov. 18, 2026IDWR related-documents list for water right 22-2128, Nov. 18, 2026IDWR's document index for water right 22-2128; the captured page shows the first 10 of 42 entries. They include Transfer 90613 filings: the application, a request for the watermaster's recommendation and the affidavit of publication. No decision on the transfer is among those 10.
Nov. 18, 2026IDWR related-documents list for water right 22-2281, Nov. 18, 2026IDWR's document index for water right 22-2281; the captured page shows the first 10 of 41 entries. They include the 2025 ownership changes and Water Supply Bank lease filings (Contract 1806 for 2024-2028 and Contract 1021 for 2019-2023).
Nov. 18, 2026IDWR points-of-diversion data for water rights 22-2128, 22-2281 and 22-10835, Nov. 18, 2026IDWR's GIS record for three Teton County irrigation rights. It shows Teton Valley Water LLC as owner of all three active, decreed ground-water rights: 2.78 cfs/622.8 AF, 0.74 cfs/234.3 AF and 0.96 cfs/214.8 AF.
Nov. 18, 2026IDWR water right report 22-10835, Nov. 18, 2026IDWR's current report for water right 22-10835, a Teton County ground-water irrigation right owned by Teton Valley Water LLC. Priority June 1, 1961; 0.96 cfs and 214.8 acre-feet for irrigation; previous owner 862 Teton LLC.
Nov. 18, 2026IDWR water right report 22-2128, Nov. 18, 2026IDWR's current report for water right 22-2128, a Teton County ground-water irrigation right owned by Teton Valley Water LLC. Priority Sept. 4, 1948; 2.78 cfs and 622.8 acre-feet for irrigation; previous owner 862 Teton LLC.
Nov. 18, 2026IDWR water right report 22-2281, Nov. 18, 2026IDWR's current report for water right 22-2281, a Teton County ground-water irrigation right owned by Teton Valley Water LLC. Priority Dec. 2, 1966; 0.74 cfs and 234.3 acre-feet; leased to the Water Supply Bank through 2028.
Nov. 18, 2026IDWR water right report 22-14668, Nov. 18, 2026IDWR's current report for water right 22-14668, an active Teton County ground-water irrigation right owned by PFG Idaho LLC. Priority Sept. 4, 1948; 0.30 cfs and 67.2 acre-feet, acre limit 19.2 within 25.8 acres. IDWR's July 9, 2025, report records it as split from 22-2128.
Nov. 18, 2026IDWR water right report 22-14669, Nov. 18, 2026IDWR's current report for water right 22-14669, an active Teton County ground-water irrigation right owned by PFG Idaho LLC. Priority June 1, 1961; 0.10 cfs and 23.2 acre-feet; combined 0.30 cfs limit with 22-14668. IDWR's July 9, 2025, report records it as split from 22-10835.
Nov. 18, 2026IDWR water right report 22-14670, Nov. 18, 2026Water right 22-14670: active ground-water irrigation right owned by PFG Idaho LLC. Priority Dec. 2, 1966; 0.70 cfs, 221.7 acre-feet on 64.7 acres; leased to the Water Supply Bank (lease 1806) through Dec. 31, 2028. IDWR's July 9, 2025, report records it as split from 22-2281.
Oct. 5, 2026Teton Valley News affidavit of publication for IDWR Transfer 90613, Oct. 5, 2026Proof that the Teton Valley News published IDWR's legal notice of Transfer 90613 (Teton County Properties LLC) and Transfer 90673 on Sept. 23 and 30, 2026, with protests due by Oct. 13, 2026.
Sept. 16, 2026IDWR request for watermaster recommendation on Transfer 90613, Sept. 16, 2026IDWR email to the Water District 122 watermaster asking for a recommendation on Transfer 90613 within 21 days. Without one, IDWR will presume the watermaster does not oppose approval.
July 20, 2026Teton County Properties LLC application for IDWR Transfer 90613, July 20, 2026Teton County Properties LLC's application to move 22 acres of water rights 22-2128 and 22-10835 from T6N R45E Sec. 29 to its land in T4N R45E Secs. 21-22, for irrigation and wildlife pond storage. Consent letters, LLC records, maps and IDWR's Sept. 16, 2026 acknowledgment are attached.
Nov. 14, 2025IDWR ownership change file, 862 Teton LLC to Teton Valley Water LLC, Nov. 14, 2025Teton Valley Water LLC's notice to IDWR that it acquired water rights 22-2128, 22-2281 and 22-10835 from 862 Teton LLC, signed by George Allen. Quitclaim deed 292111, a W-9, IDWR's Nov. 14, 2025 letter and proof reports are attached.
July 9, 2025IDWR ownership change file, 862 Teton LLC to PFG Idaho LLC, July 9, 2025PFG Idaho LLC's notice to IDWR that it acquired split portions of water rights 22-2128, 22-10835 and 22-2281, signed by Lawrence Wayne Powell, with IDWR's July 9, 2025, letter creating rights 22-14668, 22-14669 and 22-14670.
July 9, 2025IDWR water right report 22-2128 before and after split, July 9, 2025IDWR reports for water right 22-2128 dated July 3 and July 9, 2025. After the split the right dropped from 3.08 cfs and 690 acre-feet to 2.78 cfs and 622.8 acre-feet, with the difference split into 22-14668 for PFG Idaho LLC.
July 9, 2025IDWR water right report 22-14668, July 9, 2025IDWR report for water right 22-14668, split from 22-2128 when PFG Idaho LLC took ownership. It is an irrigation right of 0.30 cfs and 67.2 acre-feet (acre limit 19.2 within 25.8 acres).
July 9, 2025IDWR water right report 22-14669, July 9, 2025IDWR report for water right 22-14669, split from 22-10835 when PFG Idaho LLC took ownership. It is an irrigation right of 0.10 cfs and 23.2 acre-feet (acre limit 6.6).
July 9, 2025IDWR water right report 22-14670, July 9, 2025IDWR report for water right 22-14670, split from 22-2281 when PFG Idaho LLC took ownership. It is an irrigation right of 0.70 cfs and 221.7 acre-feet on 64.7 acres.
July 3, 2025IDWR ownership change file, McCulloch Ranches LLC to 862 Teton LLC, July 3, 2025862 Teton LLC's notice to IDWR of a change in ownership of water rights 22-2128, 22-10835, 22-2281, 22-10831 and 22-10832 from McCulloch Ranches LLC, signed by George Allen. Deeds 290683 and 290684, maps and IDWR's July 3, 2025 acknowledgment are attached.

Idaho Secretary of State (2)

Business records, captured Nov. 18, 2026.

DateDocumentWhat it shows
Nov. 18, 2026Idaho Secretary of State record for PFG Idaho LLC, Nov. 18, 2026Idaho business record for PFG Idaho LLC, an Idaho LLC filed May 21, 2025, active and in good standing. Its registered agent is Kade Christensen of Rexburg, whose address is also listed as the company's principal and mailing address.
Nov. 18, 2026Idaho Secretary of State record for Teton Commercial Holdings LLC, Nov. 18, 2026Idaho business record for Teton Commercial Holdings LLC, an Idaho LLC filed May 23, 2025, active and in good standing. Its registered agent is Kade Christensen, at the same Rexburg address as PFG Idaho LLC.

Texas Comptroller of Public Accounts (8)

Franchise tax records, captured Nov. 18, 2026.

DateDocumentWhat it shows
Nov. 18, 2026Texas franchise tax permit holders at 8350 N Central Expy Ste M1020, Nov. 18, 2026Texas Open Data query showing 32 active franchise-tax taxpayers at one Dallas suite. They include 862 Teton LLC, 862 Teton Development Corp, Teton River Ranch LLC, Teton Valley Water LLC, Oakridge Investments Inc. and George W. Allen Company Inc.
Nov. 18, 2026Texas Comptroller record for 862 Teton Development Corp, Nov. 18, 2026Texas franchise tax record for 862 Teton Development Corp, a Texas corporation registered Aug. 3, 2024. The registered agent is George W. Allen, and George Allen is president, at the Dallas business suite.
Nov. 18, 2026Texas Comptroller record for 862 Teton LLC, Nov. 18, 2026Texas franchise tax record for 862 Teton LLC, a Texas LLC registered June 7, 2022 and active. The registered agent is George W. Allen; the managers are George W. Allen and Justin Allen (2024 report).
Nov. 18, 2026Texas Comptroller record for George W. Allen Company Inc., Nov. 18, 2026Texas franchise tax record for George W. Allen Company Inc., a Texas corporation registered Sept. 21, 1984. George W. Allen is president and director.
Nov. 18, 2026Texas Comptroller record for Oakridge Investments Inc., Nov. 18, 2026Texas franchise tax record for Oakridge Investments Inc., a Texas corporation registered Sept. 19, 1994. George W. Allen is president and registered agent.
Nov. 18, 2026Texas Comptroller record for Powell Family Group LLC, Nov. 18, 2026Texas franchise tax record for Powell Family Group LLC, a Texas LLC registered Oct. 18, 2021. Its registered agent is Capitol Corporate Services Inc., and Lawrence W. Powell is the governing person (2024 report).
Nov. 18, 2026Texas Comptroller record for Teton River Ranch LLC, Nov. 18, 2026Texas franchise tax record for Teton River Ranch LLC, a Texas LLC registered June 7, 2022. The registered agent is George W. Allen; the managers are George Allen and Justin Allen (2026).
Nov. 18, 2026Texas Comptroller record for Teton Valley Water LLC, Nov. 18, 2026Texas franchise tax record for Teton Valley Water LLC, a Texas LLC registered Aug. 8, 2025. Its SOS status is active, but its right to transact business in Texas is listed as forfeited. The registered agent is George W. Allen, and no officers are listed.

Idaho Transportation Department (2)

DateDocumentWhat it shows
Aug. 24, 2026ITD email on Pinnacle Peak highway access and right of way, Aug. 24, 2026Idaho Transportation Department permits coordinator Jeff Rawson tells Tetonia's planning consultant ITD will allow two SH-33 accesses, require 120 feet of right of way (150 at intersections), and require signals at Lucas Lane, Chloe/Asher and Perry Ave.
Aug. 24, 2026ITD email thread on Pinnacle Peak highway access, May 20 to Aug. 24, 2026ITD emails with Tetonia's planning consultant: signals and turn lanes at the SH-33 accesses would be the developer's responsibility, access roadwork would start in the first phase, and ITD needs the revised traffic study before finalizing.

Idaho Department of Parks and Recreation (1)

DateDocumentWhat it shows
Oct. 9, 2026Idaho Parks and Recreation letter on Ashton-Tetonia Trail easements for Pinnacle Peak, Oct. 9, 2026IDPR Director Susan E. Buxton writes to Tetonia Mayor Brent Schindler rejecting a one-time $6,600 payment for three easements across the Ashton Tetonia Trail and asking for the developer's traffic study. Encloses the developer's master plan slides.

Teton School District 401 (2)

DateDocumentWhat it shows
Nov. 11, 2026Teton School District 401 revised comment letter on the Pinnacle Peak subdivision, Nov. 11, 2026Revised letter from Superintendent Brian Ashton repeating the $164,340 contribution request and adding a request for about five acres for a potential future school site, with the developer holding a right of first refusal if the district sells.
Sept. 1, 2026Teton School District 401 comment letter on the Pinnacle Peak subdivision, Sept. 1, 2026Superintendent Brian Ashton asks that the Pinnacle Peak subdivision voluntarily contribute $164,340 to the district's School Growth Contribution Fund, $1,274 per single-family unit and $828 per multifamily unit for 90 and 60 units.

Teton Valley Housing (4)

DateDocumentWhat it shows
Nov. 4, 2026Teton Valley Housing commission regular meeting agenda, Nov. 4, 2026Agenda for the Teton Valley Housing commission's Nov. 4, 2026 regular meeting, including ratification of emergency spending at 446 E Little Avenue and staff updates on City of Tetonia comment letters on the comprehensive plan, the Pinnacle Peak plat and annexation.
Nov. 2, 2026Teton Valley Housing progress report, Nov. 2, 2026Executive director's report to the Teton Valley Housing commission on 175 Front Street, Signal West, QWHIP administration, a repair at 446 E Little Avenue, and its comments to Tetonia on the comprehensive plan and the Pinnacle Peak plat.
Oct. 30, 2026Teton Valley Housing comments on the Pinnacle Peak preliminary plat, Oct. 30, 2026Teton Valley Housing letter to the City of Tetonia on SUB2025-3. It says the draft development agreement's three 'Affordable Lots' (2% of 150) have no pricing method, no buyer eligibility and a ten-year resale covenant.
Oct. 26, 2026Teton Valley Housing comments on the Tetonia draft comprehensive plan, Oct. 26, 2026Letter from Teton Valley Housing Executive Director Jerod Pfeffer to the City of Tetonia recommending the draft comprehensive plan add a goal for permanently deed-restricted workforce homes and a voluntary incentive program modeled on Driggs' QWHIP.

Laws, city code and other sources cited

These are cited from the publishers' own websites and are not posted here.