Pinnacle Peak public record

Comments due Nov. 30, 5 p.m.

The issues

Land use: what the applicant has asked the city for

PFG Idaho, LLC and its representative, David Ferrette, have four requests before the City of Tetonia: a preliminary plat for 90 single-family lots and 60 townhouses on about 38 acres, annexation, a comprehensive plan amendment and city zoning for the annexed land (staff report, p. 1; annexation application, p. 1; application form, p. 1). The documents give the land area differently, from about 300 to about 440 acres, and the annexation application says 389.25 (KLOA master plan study, p. 17; p. 3; annexation application, p. 1). Two draft agreements that would set the terms are unsigned (draft development agreement; draft annexation agreement).

Key facts

The documents give the land area differently, from about 300 to about 440 acres

The annexation application says 389.25 acres; the narratives and the master plan drawing, 400.25; the KLOA master plan study, about 440 and about 300.

Land area as stated in each document, in acresDraft annexation agreement 389.251; annexation application 389.25; Exhibit F legend 389; annexation narrative 399.26 and 400.25; comprehensive plan amendment narrative 400.25; master plan legend 400.25; KLOA master plan study approximately 440 and, later, approximately 300.Draft annexation agreementDraft annexation agreement: 389.251 acres389.251Annexation applicationAnnexation application: 389.25 acres389.25Exhibit F phasing map, legend totalExhibit F phasing map, legend total: 389 acres389Annexation narrativeAnnexation narrative: 399.26 acres399.26 and 400.25Annexation narrative: 400.25 acresComprehensive plan amendment narrativeComprehensive plan amendment narrative: 400.25 acres400.25Master plan drawing, legend totalMaster plan drawing, legend total: 400.25 acres400.25KLOA master plan studyKLOA master plan study: 300 acresabout 300KLOA master plan study: 440 acresabout 440300350400450acres; the scale starts at 280

Sources: the land area table in the section below, which cites the draft annexation agreement, the annexation application, p. 1, the annexation narrative, pp. 6, 14, the plan amendment narrative, pp. 3, 7, the master plan legend and the KLOA study, pp. 3, 17. The legend totals are sums of the zone acreages each legend lists.

Show the figures as a table
DocumentAcres
Draft annexation agreement389.251
Annexation application389.25
Exhibit F phasing map, legend total389
Annexation narrative399.26 and 400.25
Comprehensive plan amendment narrative400.25
Master plan drawing, legend total400.25
KLOA master plan study300 and 440

What this means for the decision

  • The two draft agreements are unsigned; city staff wrote that the development agreement “is pending further review” (staff report, Oct. 28, 2026, p. 4).
  • The draft development agreement “shall become valid and binding only upon its approval by the City Council and its recording with the City Clerk and Teton County Recorder’s Office” (draft development agreement, § 43).
  • Among other terms, the two draft agreements would have the city reserve water system capacity for the project, equal to the capacity of the water rights and infrastructure contributed to the city’s system (draft development agreement, §§ 4.2, 8; draft annexation agreement, §§ 5.4, 5.5).
  • The 2025 rezone of the 38 first-phase acres is conditioned on a subdivision application: “If the subdivision is not applied for, denied, or the application and/or approval expires, the zone shall revert back to Transitional Agriculture (TA)” (notice of decision, p. 4).

Have your say about this

Written comments to the Planning and Zoning Commission are due by 5 p.m. Monday, Nov. 30, 2026, and the commission takes spoken and written comments at its hearing at 7 p.m. Monday, Dec. 7 (hearing notice).

The comment helper opens with the “The comprehensive plan that applies” topic checked. It adds a line from the record with its source, which you can keep or delete; what you say is up to you.

Write a comment about land use Read the comment guide

The applications and draft agreements

Each section of the record opens on its own.

In brief

PFG Idaho, LLC and its representative, David Ferrette, have four requests before the City of Tetonia: a preliminary plat for 90 single-family lots and 60 townhouses on about 38 acres, annexation, a comprehensive plan amendment and city zoning for the annexed land (staff report, p. 1; annexation application, p. 1; application form, p. 1). The documents give the land area differently: 389.25 acres on the annexation application, 400.25 acres in the narratives and the master plan legend, and "approximately 440 acres of land" in a traffic study (annexation application, p. 1; annexation narrative, p. 6; KLOA master plan study, p. 3). The two draft agreements are unsigned; among other terms, they would have the city reserve water system capacity for the project and credit 75 percent of water and sewer connection fees until the developer's infrastructure costs are recovered (draft development agreement, §§ 4.2, 8; draft annexation agreement, §§ 5.4, 5.5). City staff wrote that the development agreement "is pending further review" (staff report, Oct. 28, 2026, p. 4).

About this page

PFG Idaho, LLC and its representative, David Ferrette, have four requests before the City of Tetonia for Pinnacle Peak, and the October 2026 application file includes a draft development agreement for the first phase and a draft annexation agreement for land outside the city.

The applicant's stated goals

The applicant's annexation narrative says, "Our goal is to help create a vibrant, welcoming community," and calls the project "an opportunity to improve the City's utilities and overall capacity for growth, ensuring that infrastructure keeps pace with community needs" (annexation narrative, received Oct. 9, 2026, p. 4). The draft annexation agreement states that "The Owners intend for the Project to help address current housing conditions by delivering a range of attainable for-sale and rental housing options together with year-round employment opportunities" (draft annexation agreement, Recital H). The comprehensive plan amendment narrative says the applicant "welcomes conditions the City determines are necessary to secure the public benefits described in this narrative" (comprehensive plan amendment narrative, Oct. 9, 2026, p. 7).

Both draft agreements are unsigned, with their dates left blank. The draft development agreement states that it "shall become valid and binding only upon its approval by the City Council and its recording with the City Clerk and Teton County Recorder's Office" (draft development agreement, § 43). City staff wrote on Oct. 28 that "The Development Agreement is pending further review" (staff report, Oct. 28, 2026, p. 4), and the city engineer wrote on Nov. 12 that a detailed review of the draft development agreement "will follow separately" (Sunrise Engineering for the city, Nov. 12, 2026, p. 1). These are the applicant's proposed terms, and the city has not acted on them. Staff also wrote that revisions to the plat and development agreement "would need to be complete and ready for public comment by 11/20" (staff report, p. 2); this page describes the drafts filed in October 2026.

The four requests and their file numbers

RequestFile numberLand, as statedHomes, as stated
Preliminary plat, Pinnacle Peak at the Tetons. Submitted Oct. 9, 2026, and found complete Oct. 13, 2026 (staff report, p. 4). SUB2025-3 38.25 acres (staff report, p. 1); "TOTAL ACRES = 38.346 ACRES" (Eagle Rock Engineering preliminary plat, received Oct. 9, 2026, sheet 1); "38-Acre R-3 Residential Phase" (alternative design plan, received Oct. 9, 2026, p. 1) 90 single-family lots and 60 townhouses (staff report, p. 1); "SINGLE FAMILY LOTS = 90" and "MULTI FAMILY UNITS = 60" (preliminary plat, sheet 1)
Annexation. Signed Sept. 17, 2026, and received Oct. 9, 2026 (annexation application, pp. 1-2). AX2026-3 389.25 acres, owners listed as "PFG Idaho, LLC and 862 Teton LLC" (annexation application, p. 1) No unit count on the form
Comprehensive plan amendment, to extend the 2009 plan's commercial pattern "to available land on the north and west sides of town" and add the land to the land use map. Form signed Feb. 9, 2026, and stamped received Oct. 9, 2026 (application form, p. 1; narrative, p. 2). AMD2026-1 "PFG Idaho LLC's holdings comprise 400.25 acres located to the north and west of the City of Tetonia" (narrative, p. 3) "107.77 acres of Residential designation" and an "accompanying affordable housing commitment," with no unit count (narrative, p. 7)
City zoning for the annexed land. The annexation form lists "Rezone and Comp Plan Ammendment" as related applications, and the "Annexation & Rezone Narrative" is stamped with the annexation number (annexation application, p. 1; narrative, p. 1). Filed under AX2026-3 Proposed city zoning "C2, C3, R3 and M2" (annexation application, p. 1); R-3 107.77 acres, C-2 104.45, M-2 28.68 and C-3 159.35, "Total Annexation Area 400.25 acres," while the same page's text says "the entire 399.26-acre project area must be annexed" (annexation narrative, p. 6) "hundreds of units delivered at attainable value points" (annexation narrative, p. 5)

With the plat, the applicant filed an alternative design plan proposing a landscape corridor in place of the city's 400-foot block-length standard (alternative design plan, p. 1) and a design review application for the townhouses and open space (staff report, p. 4).

The first-phase land was rezoned to R-3 in 2025 under file ZX2025-1. The city's notice of decision conditions that zoning on "an application for the proposed subdivision being submitted within 18 months from the date of this approval (4/14/2027) and pursued in good faith" (notice of decision, effective Dec. 9, 2025, p. 4).

Terms in the draft agreements

The draft development agreement covers the 150-lot first phase, with PFG Idaho, LLC, 862 Teton, LLC and Teton Commercial Holdings, LLC together as "Developer" (draft development agreement, preamble and recitals). The draft annexation agreement would annex about 389.251 acres held by the same three companies: 862 Teton, 190.267 and 29.852 acres; Teton Commercial Holdings, 32.683 acres; and PFG Idaho, 136.449 acres (draft annexation agreement, Recitals A-E).

TermWhat the draft would doSection
Reserved water capacity The city would "reserve for the exclusive use of the Development and the Property a quantity of municipal water system capacity equal to the capacity attributable to the water rights and infrastructure so contributed" and could not allocate it to any other development or user. Neither draft states a quantity. The rights would last "for the maximum period permitted by applicable Idaho law," and the development agreement says the section does not require the city "to deny or curtail water service in a manner that is unlawfully discriminatory or preferential." Development agreement, § 8; annexation agreement, § 5.4
Priority for other capacity For any water capacity beyond the reserved amount, the project would "have priority over all other development for connections to, and for the allocation of, such additional capacity." Development agreement, § 8; annexation agreement, § 5.4
75 percent hook-up fee credit The city would grant a credit "equal to seventy-five percent (75%) of each water and sewer connection, tap, hook-up, capacity, buy-in, and/or impact fee" for each dwelling unit until the credits equal the developer's "Recoverable Infrastructure Costs." Those costs would include wells, pumps, tanks, lift stations, land and water rights, and "engineering, surveying, legal, financing, carrying, and other soft costs." Where the law limits the credit, the city "shall provide the Developer the economic equivalent of the unapplied portion." The drafts state the intent that the developer "be made whole for, but not recover more than," those costs, and the annexation draft says the arrangements "do not constitute development impact fees imposed under the Idaho Development Impact Fees Act." Water rights count: the development agreement includes in Recoverable Infrastructure Costs "the cost of acquiring real property and interests in real property (including fee title, easements, rights-of-way, leases, and water rights) used or useful for, or dedicated or made available to, the City’s water and/or sewer systems" (§ 4.2(a)(ii)). In consideration of the same water rights, § 8 has the city reserve capacity "for the exclusive use of the Development and the Property." Development agreement, § 4.2(a), (b), (d), (e); annexation agreement, §§ 5.1, 5.5-5.5.5
$500,000 connection fee Any development outside the annexed land that connects to the owners' water or sewer lines would pay the city a connection fee of "Five Hundred Thousand Dollars ($500,000.00) per connection," which the city would remit to the owners within 30 days. The fee would be "subject to periodic review and adjustment by the City so that the Connection Fee at all times represents a reasonable buy-in," and the city's obligation is limited to fees collected and "shall not require the City to expend its own funds." Annexation agreement, § 5.3
Reimbursement for oversized lines For 30 years after the city accepts a line sized to serve land beyond the project, an outside user could not connect until it paid "a reimbursement equal to fifty percent (50%) of the Owners' actual and verified cost" of that segment, remitted to the owners. This is in addition to the $500,000 connection fee. Annexation agreement, §§ 5.1-5.3
Street maintenance The developer would maintain streets "for a period of five (5) years following the City's Written Acceptance." After that, maintenance of the streets, open space "and all other Public Improvements within the Development shall be the sole responsibility of the City." Development agreement, § 10.2(a), (d)
Snow removal "The Developer's street maintenance obligation excludes, and the City shall at all times be responsible for, snow and ice removal and any damage resulting from snow or ice removal or accumulation." The annexation draft lists "road maintenance and snow removal" among the services the city would provide on annexation. Development agreement, § 10.2(a); annexation agreement, § 4
Open space maintenance The developer would provide "basic landscaping services" to open space for three years after acceptance. The city would be responsible "at all times" for "repair or replacement of hardscape, equipment, and irrigation infrastructure, and for all damage to the open space from any cause, including vandalism," and would take over all open-space maintenance after three years. Lanes, shared driveways, landscaping and common areas would be maintained by the developer or an owners' association "in perpetuity." Development agreement, § 10.2(b)-(d)
30-day deemed completion If the city engineer neither accepts finished improvements nor delivers a list of deficiencies within 30 days of the developer's notice, the improvements "shall be deemed to have achieved Substantial Completion for all purposes under this Agreement, including the release and reduction of financial security." The same 30-day rule would apply to each resubmission. Development agreement, § 20
Phasing changes The subphases "are conceptual only" and "do not constitute fixed or committed terms of this Agreement." The developer could change their number, order, boundaries and timing "in its discretion," and such a change "shall be administrative in nature and shall not, by itself, constitute a modification of this Agreement requiring the notice-and-hearing procedures otherwise applicable to amendments of this Agreement." A change could not reduce the number of lots or dwelling units or the total improvements, and the developer would give the city written notice, with revised cost estimates where a change affects the improvements' scope or cost. Subphases could be built "in any order and in any combination." Development agreement, §§ 25, 25.6
Vesting The developer's rights would vest under the rules in effect on the agreement date. The city could not apply a later amendment that would "(a) reduce the number of permitted lots or units, (b) increase infrastructure or off-site improvement requirements, (c) impose additional design or landscaping standards, or (d) otherwise materially increase Developer's costs or reduce Developer's entitlements under the Preliminary Plat," except amendments required by state or federal law and health and safety rules of general application. Development agreement, § 27
Affordable lots "Affordable Lots" would be "not less than five percent (5%) of such total townhome lots (i.e., three (3) townhome lots)" if 60 are platted, affordable to households earning up to 120 percent of Teton County area median income. Affordability could be met through Teton County Housing Authority oversight or a 10-year resale covenant limiting price increases to 3.5 percent a year, compounded. No water or sewer hook-up fees would be charged to the developer for these lots. Development agreement, §§ 1.13, 1.14, 4.1, 10.3
Perry Avenue paving The developer would pave Perry Avenue "from State Highway 33 to the end of the Off-Highway Parking ("OHP") area" at its own cost, starting "within ______ days" after annexation of the rest of the Pinnacle Peak land. The work would consist "solely of a twenty-four foot (24') paved travel lane and associated striping," with no sidewalks, curb, lighting or drainage, and the developer would have "the sole and exclusive right" to select contractors, with a final inspection by the city. "If Annexation has not occurred on or before March 31, 2027," the obligation "shall automatically terminate." Development agreement, § 25.2
Which agreement controls The development agreement says that in a conflict with the annexation agreement, "the terms and conditions of this Agreement shall prevail." Development agreement, § 42

The draft development agreement would also require the developer to build all improvements "at its sole cost and expense," to post a bond or letter of credit for 125 percent of the estimated cost of each subphase's improvements, reduced to 25 percent on substantial completion and released a year later if no defects remain uncured, and to warrant the improvements for two years after acceptance. No building permits would issue in a subphase until its public improvements and utility connections are substantially complete, and the developer would pay the city's reasonable attorney fees for drafting the agreement (draft development agreement, §§ 2, 11, 13, 23, 39). The annexation draft says the owners "intend, at their sole cost and expense," to build "certain" water and sewer mains (draft annexation agreement, § 5.1), costs it counts among the Recoverable Infrastructure Costs (§ 5.5.1).

Narrative commitments compared with the draft agreements

The applicant's narratives describe some commitments that the text of the two draft agreements, read in full, does not contain, and state others in different terms. The development agreement covers only the 150-lot first phase, and the annexation agreement says the "specific terms, timing, and allocation of responsibility" for improvements and water conveyances "are to be addressed in one or more separate development and other agreements and related approvals" (draft annexation agreement, Recital J).

CommitmentWhat the narrative saysWhat the draft agreements say
1.0 cfs of water rights "Pinnacle Peak will convey a full 1.0 CFS of water rights to the City of Tetonia" (annexation narrative, pp. 10-11). "Prepared to bring 1.0 cfs of water to the City of Tetonia" (comprehensive plan amendment narrative, p. 4). Neither draft states a flow or quantity. The annexation draft says the owners intend "to make available to the City a portion of the water rights associated with the Property" (Recital J), and both drafts tie the reserved capacity to whatever water rights and infrastructure are contributed (development agreement, § 8; annexation agreement, § 5.4).
3-acre public building site "Within this R3 area, 3 acres are further dedicated as donated public land for a Tetonia public building" (annexation narrative, p. 6). "The Applicant is dedicating 3 acres to the City of Tetonia," "at no cost to the City" (comprehensive plan amendment narrative, p. 6). Neither draft's text contains a dedication of land for a public building. The phasing map attached to the annexation draft as Exhibit F labels an area "3 ACRES PUBLIC BUILDING," and the recitals mention "civic uses" (draft annexation agreement, Recital G and Exhibit F).
School district contribution The school district's study recommends "$1,274 per single-family dwelling unit and $828 per multi-family dwelling unit. This is a voluntary contribution that Pinnacle Peak will happily commit to" (annexation narrative, p. 7). Neither draft's text mentions schools or a contribution. The Exhibit F map labels "10 ACRES PUBLIC SCHOOL" with the note "School Will come online when needed" (draft annexation agreement, Exhibit F). The city's contract planner wrote on Nov. 16 that the school district "requested a per-lot contribution, which the Developer has agreed to provide through the Development Agreement" (planner's memo, Nov. 16, 2026, p. 7).
No ballfield lighting "The baseball complex will operate only between Memorial Day and Labor Day, with play limited to daylight hours; no field lighting will be installed, so no night games or associated noise or light will occur" (annexation narrative, p. 11). Neither draft contains a term on ballfield lighting, season or hours of play. The annexation draft covers the land the Exhibit F map shows for the ballfields (draft annexation agreement, Exhibit F).
Dark Sky lighting "Exterior lighting designed to prevent light trespass (Dark Sky compliant)" (comprehensive plan amendment narrative, p. 5). Neither draft contains a Dark Sky or light-trespass term. The development agreement mentions lighting as an item in the improvement plans and as an item excluded from the Perry Avenue work, and the annexation draft lists "street lighting" among city services (development agreement, §§ 2, 25.2; annexation agreement, § 4).
Perry Avenue paving "Committed to funding the paving of Perry Avenue from the rails-to-trails corridor to Highway 33, supporting the school crossing" (comprehensive plan amendment narrative, p. 4). The development agreement would limit the work to a 24-foot travel lane and striping from Highway 33 to the end of the off-highway parking area, with no sidewalks, triggered by annexation and ending if annexation has not occurred by March 31, 2027 (development agreement, § 25.2).

The narrative's street and park upkeep periods match the draft development agreement: five years for streets, "excluding snow and ice removal," and three years of "basic landscaping services" for parks and open space. The narrative counts both periods "following construction" (annexation narrative, p. 11), and the draft counts them from the city's written acceptance (draft development agreement, § 10.2).

What the project website says

The Pinnacle Peak project website, pinnaclepeaktetons.com, describes the first phase. The table sets its statements, as captured Nov. 19, 2026, beside the city record. The links go to copies saved that day at the Internet Archive.

TopicThe website saysThe city record shows
Homes and approvals Answering "How many homes will there be?": "The project has been approved for 90 single-family homes and 60 townhomes." The same page says, "The City approved a rezone from Transitional Agriculture to R3 and has approved a conditional use permit for single-family homes within the R3 zone," and "Final lot layouts, home counts, and community features are subject to subdivision review and approved plans" (FAQ page, Nov. 19, 2026). The preliminary plat for 90 single-family lots and 60 townhouse lots is set for the Planning and Zoning Commission's public hearing on Dec. 7, 2026 (hearing notice, p. 1). The city's application form lists "P&Z Commission review, public hearing, and recommendation" followed by "City Council review and final decision" (preliminary plat application, p. 2). The 2025 approvals were a rezone to R-3 and a conditional use permit for single-family homes, under file ZX2025-1 (notice of decision, p. 1).
Schedule The home page's timeline reads "Spring 2025 / Acquisition / PFG Idaho Property Acquisition," "Fall 2026 / Construction Begins / Infrastructure Construction Begins" and "Summer 2027 / First Completed / First Home Completed" (the slashes mark its line breaks), and the page is headed "Coming to Tetonia, Idaho 2027" (home page, Nov. 19, 2026). The FAQ says, "Our team has publicly described 2027 as the target year for the first homes. That is a target, not a guaranteed start or completion date" (FAQ page). Staff's timeline gives Jan. 21, 2027, as the date by which the commission would make its recommendation to the City Council (staff report, p. 2). Under the city code, the council requires the developer to sign a development agreement as a condition of approving a final plat (city code 9-11-04-3(L), pp. 15-16). The city engineer wrote that "Preliminary plat approval does not reserve capacity for all 150 units. Confirm capacity and completed mitigation before service" (Sunrise Engineering, Nov. 12, 2026, p. 5).
The larger plan "Is the whole larger area around the neighborhood part of this approval?" "No. This FAQ describes the 38-acre residential neighborhood. Other parcels, phases, or uses require their own applications and approvals" (FAQ page). The annexation application, AX2026-3, for 389.25 acres, and the comprehensive plan amendment, AMD2026-1, were stamped received Oct. 9, 2026 (annexation application, p. 1; application form, p. 1). Staff wrote on Oct. 28 that they had "not been fully evaluated yet" (staff report, p. 7).

Figures that differ among the applicant's documents

Land area

DocumentAcresSource
Draft annexation agreement"approximately 389.251 acres in the aggregate," in four parcelsRecitals A-E
Annexation application389.25p. 1
Phasing map, Exhibit F to the annexation draftLegend: C-3 160, C-2 102, R-3 102, M-2 25 (these add to 389)Exhibit F
Annexation narrative"the entire 399.26-acre project area must be annexed"; "Total Annexation Area 400.25 acres"; "the annexation of the 400.25-acre tract"pp. 6, 14
Comprehensive plan amendment narrative"PFG Idaho LLC's holdings comprise 400.25 acres"; "It brings 400.25 acres inside the Area of City Impact"pp. 3, 7
Master plan drawing, received Oct. 13, 2026C-3 159.35, C-2 104.45, R-3 107.77, M-2 28.68 (these add to 400.25)legend
Master plan transportation study, KLOA, for Powell Family Group, Oct. 9, 2026"approximately 440 acres of land"; later, "the approximately 300-acre development"pp. 3, 17

The documents also differ on who owns the land. The draft annexation agreement assigns 136.449 acres to PFG Idaho, 220.119 acres to 862 Teton and 32.683 acres to Teton Commercial Holdings (Recitals A-D), the annexation application lists PFG Idaho and 862 Teton as owners (p. 1), and the comprehensive plan amendment narrative gives PFG Idaho's holdings as 400.25 acres (p. 3). The annexation narrative calls C-2 "General Commercial" and C-3 "Recreational Commercial" (p. 6), and the draft annexation agreement calls them "Community Commercial" and "Highway Business" (§ 3).

Homes at full buildout

DocumentSingle-familyTownhomesManufacturedApartments or multifamilyTotal
TischlerBise impact report for Powell Family Group, Dec. 23, 2025 (p. 5)310 (15 large-lot, 295 small-lot)248120102780, as printed
KLOA master plan transportation study, Oct. 9, 2026 (pp. 3, 17)31028812072790, the sum of the four figures the study lists; it prints no total

The applicant's 2025 rezone narrative described a first phase of "up to 100 residential units" on the 38-acre parcel (2025 rezone narrative, p. 1); the plat now before the commission shows 150. The annexation narrative and both draft agreements give no total for the full plan.

Water rights to be conveyed

DocumentWhat it saysSource
2025 rezone narrative"A portion of the existing Pinnacle Peak water rights will be conveyed to the City of Tetonia. Pinnacle Peak currently has 1.0 CFS in ground water rights that are roughly equal to 528 EDUs."p. 3
TischlerBise impact report, Dec. 23, 2025"Pinnacle Peaks will also dedicate 136.5 acres of water rights totaling 1.5 CFS," valued at $2.5 million "per the development team's water consultant"; later, "1.5 CFS which is 136.6 acres of water rights"pp. 7, 22
Annexation narrative, received Oct. 9, 2026"Pinnacle Peak will convey a full 1.0 CFS of water rights to the City of Tetonia"; "1.0 CFS (≈ 528 EDUs) — full 1.0 CFS to be conveyed"pp. 10-11
Comprehensive plan amendment narrative, Oct. 9, 2026"Prepared to bring 1.0 cfs of water to the City of Tetonia."p. 4
Applicant engineer's responses, received Oct. 9, 2026"Developer is working with City on water needs and has proposed to transfer water rights as needed."p. 1, response 6
Draft annexation agreement"a portion of the water rights associated with the Property"Recital J, § 5.4
Draft development agreement"the water rights and water infrastructure made available to the City by the Developer and its affiliates," with no quantity§ 8

The county's area of city impact

The draft annexation agreement states that "The Property is located within the Tetonia Area of City Impact" (draft annexation agreement, Recital F). Teton County's Board of County Commissioners approved Ordinance 2025-1222, which sets a new boundary and zoning for that area, by a 3-0 vote on Dec. 22, 2025, with two corrections, one to make Exhibit A comply with Exhibit B and one on the northerly boundary (Board of County Commissioners minutes, Dec. 22, 2025, pp. 8-9). The copy of the ordinance posted on the county's website leaves blank the day of approval and the publication date (posted ordinance, p. 2).

In the county's GIS layers, checked Nov. 19, 2026, the first-phase plat parcel, RPC00000291201, is inside Tetonia city limits, and 862 Teton LLC's parcel RP06N45E290011 in Section 29 lies inside the area of impact, in the county's AOI-2.5 zone, which has a 2.5-acre minimum lot size (parcel layer; city limits and impact-area layer; area of impact zoning layer; posted ordinance, p. 9). These are the county's mapping data, not a legal description of the boundary. The approvals page has the details.

What city staff and the city engineer have written

The city's contract planner, Ashley Koehler, and its engineering firm, Sunrise Engineering, have reviewed the preliminary plat. Staff wrote in October that the annexation and comprehensive plan amendment applications had been received "but it has not been fully evaluated yet" (staff report, Oct. 28, 2026, p. 7).

The draft development agreement

Reviewing the preliminary plat application in August, before the October revision, Sunrise Engineering wrote that the development agreement "will need to be reviewed by city legal and approved by city council. This document is not fully vetted, is a work in progress" (Sunrise Engineering for the city, Aug. 20, 2026, p. 1). In November the city engineer wrote that a detailed review of the draft development agreement would follow separately and that "The City should use that review to establish improvements, costs, phasing, water mitigation, maintenance, deadlines, security, and acceptance" (Sunrise Engineering, Nov. 12, 2026, p. 5). The contract planner recommended that "the development phasing plan, including the timing of infrastructure improvements and city's maintenance obligations, be clearly documented in the Development Agreement" (planner's memo, Nov. 16, 2026, p. 8).

Water and sewer capacity

The draft development agreement recites that "The Development will utilize the existing City of Tetonia sewer and water capacity" (draft development agreement, recitals and § 4.1). In August the city's engineer wrote that "The capacity of the water distribution system currently is at capacity" (Sunrise Engineering, Aug. 20, 2026, p. 3), and staff wrote in October that "the City does not have the water capacity to service this subdivision without mitigation" (staff report, p. 6). The applicant's annexation narrative also says that "The City's recently completed water report indicates that no additional ERUs (Equivalent Residential Units) are currently available until infrastructure improvements are completed" (annexation narrative, p. 10).

The city engineer's November review asks the applicant for a Water Rights Mitigation Plan under the city's ordinance and states that "Required capacity must be available before connections are released" (Sunrise Engineering, Nov. 12, 2026, p. 3). It asks the applicant to identify its share of city sewer improvements and to "Establish costs, responsibilities, completion dates, and phase limits in the development agreement" (p. 2), and it states that "Preliminary plat approval does not reserve capacity for all 150 units. Confirm capacity and completed mitigation before service" (p. 5).

In the applicant’s Nov. 19 filing, its engineer’s new water report lists "Available ERUs Before Required Upgrades: 0" (Eagle Rock water report, Nov. 18, 2026, p. 3), and the response worksheet says "Applicant understands that no connections can be made until additional water rights are received and a well is installed," that the mitigation plan "will be provided upon receipt of the City’s adopted ordinance," and, on the developer’s share of sewer improvements, that "The DA won’t be signed until the Final Plat is recorded. We have time to resolve this issue" (response worksheet, pp. 6-8). The draft development agreement was not revised. Each request and answer is on City review and answers.

Reviewing the concept plan in February 2026, Sunrise Engineering wrote for the city that utility connections "will be issued on a first-come, first-serve basis with building permits" (Sunrise Engineering letter, Feb. 3, 2026, filed with the applicant's concept-review responses, pp. 17-18). The drafts' reserved-capacity and priority terms are in the development agreement, § 8, and the annexation agreement, § 5.4.

Impact fees

The 2025 notice of decision records that the Planning and Zoning Commission asked to notify the council "that Impact Fees should be adopted and implemented city-wide prior to a subdivision of this scale" (notice of decision, p. 3). Staff wrote in October that "It is also advised that the city continue to pursue Impact Fees to help off-set the impacts that a development of this size will generate" (staff report, p. 7). The draft agreements' 75 percent credit would apply to water and sewer impact fees, among other water and sewer connection charges (draft development agreement, § 4.2(b)).

Perry Avenue and street connections

The city engineer wrote in August that "Connection to Perry Ave. as shown is required with this development plan" (Sunrise Engineering, Aug. 20, 2026, p. 1). The contract planner wrote that "An easement to cross the Rail Trail at Perry Ave is a priority connection and should be obtained as part of any subdivision approval," and that "Improvements to Perry Ave to pave it are included in the Development Agreement, but it is recommended that adjacent sidewalks also be installed as part of this connection" (planner's memo, Nov. 16, 2026, p. 3). For Lincoln Lane, which the planner describes as "proposed to be a gravel road" (p. 6), the planner asked that the development agreement give a paving time "that is not based only on phases, but to a date certain as well" (p. 3), and the engineer asked for "a paving deadline that does not depend solely on Phase 2 proceeding" (Sunrise Engineering, Nov. 12, 2026, p. 4). The applicant answered on Nov. 19 that "City and Developer to establish in development agreement paving deadline," and that "City is responsible for coordination and obtaining necessary easements and permits for crossing Rails-to Trails. If not secured, access from Hwy 33 and Egbert Ln will be required" (response worksheet, pp. 11-12). Its revised plat adds a 10-foot pathway (revised plat, sheet 2).

Maintenance and parks

The city engineer wrote that "The developer shall maintain roads until formal City acceptance" and asked that the development agreement "Include chip sealing three years after City acceptance, with specifications and security" (Sunrise Engineering, Nov. 12, 2026, p. 4). On parks, the engineer wrote that "City maintenance of the southern park/playground requires Council approval and an agreement," and recommended assigning the remaining parks and open space "to the developer or Property Owners Association unless otherwise accepted by the City" (p. 5). The planner's memo reports that public works, the city engineer and the commission commented that only the "Dog Park" and "Playground Park" be dedicated to the city, with the remaining green space "managed by the HOA" (planner's memo, p. 4).

The revised plat received Nov. 19 shows "2 PUBLIC USE OPEN SPACE LOTS" to be dedicated to the city, down from 4 on the Oct. 9 plat, with other open space "TO BE OWNED AND MAINTAINED BY HOA" (revised plat, sheets 1-2; Oct. 9 plat, sheet 1). The applicant wrote: "City to own and maintain larger north and south parks. HOA will own and maintain all other common space and open space," that "Mailbox cluster has been moved outside of City park," and that "The roundabout has been removed" (response worksheet, pp. 7, 11, 12). Plat note 11 makes the new pressure irrigation system "OWNED AND MAINTAINED BY THE HOA"; if it is not built, the developer is to "COORDINATE WITH CITY FOR APPROPRIATE CONNECTION FEES" (revised plat, sheet 1).

Affordable lots

The contract planner wrote that "Three (3) of the Townhouses are proposed to be deed restricted," that their enforcement and administration "are documented in the D.A.," and that "it is recommended that Teton Housing Authority advise the City and Developer in the necessary language for the D.A." (planner's memo, Nov. 16, 2026, p. 7).